Select your language

Premium ventilation

The problem of hundreds of heat-burdened guests was solved with a roof ventilation unit in Australia. Know the details of the project.

By Vanesa Restrepo

A guest's experience starts from the moment of check in and an uncomfortable start to the holiday is a very bad first impression. These postulates are the most important norms among the managers and employees of the Sheraton Mirage hotel, located in Port Douglas, in the extreme north of Queensland, Australia.

Port Douglas is a tropical coastal town, whose annual temperatures range between 20°C and 27°C, which forces hotels to have an efficient air conditioning and cooling system to generate well-being for tourists without excessively increasing energy costs.

- Publicidad -

The Sheraton Mirage is no exception. However, part of the lobby has an open area in which it is impossible to install air conditioners and where the small pedestal and ceiling fans that had been installed several years ago did not meet the expectations of customers who arrived hot after traveling several hours or walking around.

Simple and effective solutions
Faced with such difficulty, the hotel managers took on the task of finding a more efficient ventilation system for their lobby and it was then that a solution appeared, from the hand of the multinational Big Ass Fans, specialized in the manufacture of industrial fans and for commercial areas.

"Before installing the ventilation elements, hotel guests and employees suffered from high humidity, unbearable heat and stagnant air. A solution was needed that improved comfort and that was not expensive or with high energy consumption and that, in addition, did not require continuous and deep maintenance, "explains Alex Reed, commercial and communications director of Big Ass Fans.

After evaluating the spaces and the real need for ventilation, the company decided that the best solution would be to install a fan 3.7 meters in diameter (12 feet). Reed explains that with that large diameter, the fan moves more air than 36 small fans, and records only a quarter of the energy consumption. And as if this were not enough, the engine of the equipment has no direct transmission gears, which provides a smooth and silent operation, less than 40dBA. "Thus, guests make their check in a pleasant experience, without annoying noises and in a cool atmosphere."

Improving comfort
Since the fan was installed in the Lobby of the Sheraton Mirage, guests said they are more comfortable in the hotel. The explanation, according to Reed, is quite simple: "A fan was installed in an environment where air conditioning was not practical from the point of view of costs and energy consumption. The element turned out to be the best solution to ensure the comfort of customers efficiently."

This type of equipment is perfect for hotels, especially for those open areas or large traffic of people, such as restaurants, lounges, spa or recreational areas, thanks to its large volume that moves more air, the low noise that does not interfere with any daily operation and the level of comfort generated by circulating fresh air, without generating an environment too cold for the guest.

According to Alex Reed, the fan maximizes the efficiency of an air conditioning system by distributing air conditioning, thanks to its patented base and fin design. "Additionally, its appearance can be customized through special packages that will allow the piece to adapt to the decoration concept that the space has."

- Publicidad -

To highlight
Comparative advantages

In the current market there are no ventilation units larger than the 3.7-meter one installed by Big Ass Fans at the Sheraton Mirage in Port Douglas, Australia. This type of units, designed for large spaces with commercial use are characterized by having integrated controls and thanks to the fact that their motors do not incorporate gears, their operation is silent.

Big Ass Fans also provides solutions in industrial ventilation and its main added value is the possibility of incorporating the pieces into the design established in the area in which they will be installed, making the fan a visual complement, instead of a cumbersome and large piece, says Alex Reed, commercial and communications manager of the multinational company.

To highlight
Synthesis

* Firm in charge of the project: Sheraton Mirage – Port Douglas
* Manufacturers involved: Big Ass Fans
* Contact: Tim Murray, Engineering Manager
* Email : [email protected]
* Company covered with installation: Sheraton Mirage
* Fan power consumption: 30 W at low speed, 145 W at medium speed and 630 W at high speed.


No comments

• If you're already registered, please log in first. Your email will not be published.

Leave your comment

In reply to Some User
TecnoEdificios 2026 will open its academic program for smart building professionals in Latin America

TecnoEdificios 2026 will open its academic program for smart building professionals in Latin America

Mexico. The TecnoEdificios 2026 congress presented its academic program aimed at professionals linked to the management, operation and design of smart and efficient buildings in Latin America.

New generative AI feature makes it easier to interpret alerts in building management

New generative AI feature makes it easier to interpret alerts in building management

International. The tool seeks to help facility management teams more clearly understand predictive data and recommendations generated by artificial intelligence, facilitating decision-making and...

Perimeter curtain detector with integrated outdoor camera

Perimeter curtain detector with integrated outdoor camera

International. Ajax Systems announced the launch of the CurtainCam Outdoor HighMount (PhOD) Jeweller, an outdoor curtain-like motion detector that incorporates built-in photo verification.

Metro de Quito, the only Latin American finalist in the international cleaning award

Metro de Quito, the only Latin American finalist in the international cleaning award

Ecuador. The Quito Metro system was selected as the only finalist from Latin America in one of the most important international recognitions in the professional cleaning industry, highlighting the...

New IMEI presidency BOMA defines the strategic vision 2026–2027

New IMEI presidency BOMA defines the strategic vision 2026–2027

Mexico. IMEI BOMA begins a new institutional stage with the arrival of Eng. Ariel Campos Trejo to the presidency for the period 2026-2027, accompanied by Alberto Morett Dosal as executive vice...

Facility Management in Elite Sport

Facility Management in Elite Sport

Spain. The Santiago Bernabéu Stadium, home of Real Madrid, is once again at the centre of the debate on the management of large-scale sports infrastructures.

Latin America seeks to accelerate the adoption of smart buildings

Latin America seeks to accelerate the adoption of smart buildings

Latin America. A new report presented by Siemens and Latinometrics reveals that the region has only 10 smart buildings per million inhabitants and faces the challenge of tripling its modernization...

Digital twins and simulation: keys to decision-making

Digital twins and simulation: keys to decision-making

Latin America. Today's business environment demands speed and accuracy in strategic processes. In this context, digital twins are consolidated as a tool that transforms decision-making.

Clean Air, Clear Mind: How Technology Is Making Life Better at Work

Clean Air, Clear Mind: How Technology Is Making Life Better at Work

Today, ensuring good indoor air quality (IAQ) in offices, shops, and commercial buildings is no longer a luxury, but a necessity. By Diana Ardila

HVAC System

HVAC System

MojaveThe latest version of ArctiDry HP, an easy-to-install, patented liquid desiccant heating, ventilation, and air conditioning (HVAC) system, now includes a heat pump for energy-efficient heating...

Subscribe Here
Remember Me
SUBSCRIBE TO OUR ENGLISH NEWSLETTER.
DO YOU NEED A PRODUCT OR SERVICES QUOTE?
Patrocinado por:
ConsorcioTec Logo
LATEST INTERVIEWS
SITE SPONSORS










LATEST NEWSLETTER
Ultimo Info-Boletin